205 City of Wylie Texas
Demolition of existing Rapid Mix Basin, four (4) Clariflocculator units (with appurtenant systems) four (4) Raw Water Meter Vaults and South Sludge Pump Stations. Demolition of existing piping, electrical conduits, control wiring, etc. that will no longer be utilized. Addition of a new Treatment Structure comprised of a Raw Water Meter Vault, Rapid Mix Area, and two (2) sets of Flocculation Basins, Sedimentation Basins and other site modifications.
$21,032,000