203 Dallas Water Utilities
Expanding the existing Peak Flow Basin No. 4 to contain a total volume of 214.5 million gallons. New perimeter access road. Concrete repair to embankment walls in Peak Flow Basin Nos. 1-3. Installation of a 48-inch diameter diversion lie from the Peak Flow Basin No. 1 influent pipe lines to Peak Flow Basin No. 4, including installation of four isolation plug valves.
$14,400,000